Customer had a quote from electrician to bond a new gas meter back to MET. Quote £120.00.
Did the work and also changed a basin tap for £60.00 + £20.00 for 10mm earthing cable and two clamps. A saving of £40.00
Job
Removed shower pull switch from ceiling at side of shower, run a new cable to other side of bathroom (in loft) and fit 45 amp double pole switch on wall.
Electricians quote: £175.00 inc Parts
Job done for: £107.00 Inc parts. Saving customer £68.00
Job
Paint landing and stair walls only,
Paint bedroom walls only,
Repair electrical fault on shower
Repair leak on water inlet to cistern,
Fit new kitchen tap.
Job done: £155.00
Job
Replace seven plastic light switches for brushed chrome,
Replace twelve plastic wall sockets with brushed chrome,
Replace six plastic ceiling lights with metal fittings.
Electricians quote: £280.00
Job done: £180.00. Saving customer £100.00
Job
Replace toilet with close fitting system
Plumber Quote: £210.00 + parts
Job done: £100.00 + parts. Saving customer £110.00
Job
Replace like-for-like electric shower
Electrician Quote: £90.00
Plumber Quote, to connect: £60.00
Job done: £80.00. Customer saved £70.00
Job
Fit outside tap
Plumber Quote: £85.00 + materials
Job done: £60.00 including materials. Customer saved £25.00
Job
Repair burst pipe in outside toilet
Job done: £40.00 + materials.
Job
Combi boiler had stopped working due to freezing conditions. Five callouts in January 2011.
Plumber Quotes between:£85.00 and £125.00.
Jobs done: £50.00 each.
One job I attended had been done three times (three different days) by same plumber for £80.00 each time (£240.00!).
Job
Remove bath, toilet and sink (ground floor) as four floor joists had rotted (wet rot) due to unknown leak from bath seal over three or more years. New joists and floor required.
Builder 1 quoted £1,795.00 inc materials.
Builder 2 quoted £1,800.00 inc materials.
Job done: £800.00. Customer supplied materials @ £200.00. Customer saved £700.00
Job
Man of house had drilled wall for shelving drilling into 15mm pipe leading to bathroom on upper floor. Luckily, very luckily was not injured.
Plumber quoted: £210.00 inc parts. Plasterer wanted £110.00 to make good. Total cost £320.00!
Job done for: £220.00.00 inc parts and making good. Saved customer £100.00.
Job
Landlord had been paying electrician £250 ever twelve months to do a Periodic Inspection (PIR). Explained to landlord that a PIR (unlike gas safety check) is only required every 5 to10 years and even then, is not a legal requirement. Gas safety check is a legal requirement every 12 months.
I now PAT test on change of tennant.
Saved landlord thousands...